Back
Rail construction
Storvik signal project
The project aims to enable simultaneous entrances at Storvik’s operating site. The scope includes work to speed up ATC announcements upon departure from platform, new signals on track 2 at platform transition and changing some signals to optically display pre-signal messages. New signal cabinet 12a is installed and ducting work is also included. The switchgear is type -85.