Back
Rail construction
Uusimaa track maintenance, Kuura Alliance
The alliance formed by Väylä, Finrail and GRK Rail will be responsible for the maintenance of the Uusimaa railway tracks for at least the next five years. The maintenance agreement covers the entire Uusimaa railway network, including, e.g., 315 km of multi-track tracks, 1100 switches, control and safety equipment systems, 440 bridges, 23 km of tunnels with systems and traffic locations and outdoor areas.
GRK Rail Oy
