  • 05/2021 - 07/2023

The contract includes about 60 km of electrification of the track between Karjaa and Hanko. About 850 electric poles with foundations and about 300 km of track electrification conductors installed in the contract. The section includes, among other things, three traffic locations and a turnaround bridge (Pohja railway bridge, Ekenäs).