Project information
							
								Contact person							
								
									Lucas Holm									 +358 40 658 5020								
							
						
							
								Client							
								
									Finnish Transport Infrastructure Agency								
							
						
							
								Project period							
								
							
						The contract includes about 60 km of electrification of the track between Karjaa and Hanko. About 850 electric poles with foundations and about 300 km of track electrification conductors installed in the contract. The section includes, among other things, three traffic locations and a turnaround bridge (Pohja railway bridge, Ekenäs).